Certificate of conformity (CoC) in Canada: what buyers need
What a certificate of conformity is, what it should contain, and how it differs from a mill cert and a first article inspection, for Canadian procurement.

A certificate of conformity (CoC), also called a certificate of compliance, is a signed statement from the supplier that the goods delivered meet the specified requirements: the drawing, the standards and the purchase order. It is a declaration, not a test report: it says the parts conform. For evidence of the actual material or dimensions you also want a mill certificate (material) and, for first runs, a first article inspection report. Ask for the CoC on the purchase order so it ships with the parts.
Do this next:
- State on the purchase order that a certificate of conformity is required with delivery.
- For material evidence, also require a mill certificate; for a first run, a first article inspection.
- Request a quote and tell us which documents your program needs.
What a certificate of conformity is
A certificate of conformity is the supplier's signed declaration that the parts in the shipment conform to the agreed requirements: the drawing revision, the materials, the processes, the applicable standards and the purchase-order terms. It typically identifies the part number and revision, the purchase order, the quantity, the lot or batch, and the standards met, and it is signed by someone authorized at the supplier (often quality). It is the paper trail that says these parts are what you ordered, and it is common in aerospace, defence, medical and other regulated supply chains.
What a CoC should contain
| Field | Why it matters |
|---|---|
| Part number and drawing revision | Ties the certificate to the exact design |
| Purchase order number | Links it to your order and terms |
| Quantity and lot or batch | Traces which parts the certificate covers |
| Materials and processes | States what the parts are made of and how |
| Standards or specifications met | Names the requirements the parts conform to |
| Authorized signature and date | Makes it an accountable declaration |
A certificate that just says conforms, with no part, revision or purchase-order reference, is weak; the value is in the traceability.
How a CoC differs from other documents
A certificate of conformity is a declaration. It is not the same as:
- A mill certificate (material test report): the mill's record of the actual chemical and mechanical properties of the material. Evidence, not a declaration.
- A first article inspection report: a full dimensional verification of the first part off a new setup, proving the process makes the drawing. See first article inspection and material certs.
- A certificate of analysis or a test report: measured results for a specific property.
For a controlled part you often want all of them: the CoC to declare conformance, the mill certificate to prove the material, and the first article to prove the dimensions.
When to require one
Require a CoC when conformance has to be documented: regulated sectors (aerospace to AS9100, defence, medical to ISO 13485), safety-critical parts, or any program where you need a paper trail. State it on the purchase order, and specify the supporting evidence (mill certificate, first article) you also need, so it all ships together rather than chasing documents after delivery.
What to send for a quote
Your part, the standards it must meet, and the documents your program requires (certificate of conformity, mill certificate, first article inspection). Request a quote and we route it to Canadian shops that can supply the paperwork, not just the parts.
FAQ
What is a certificate of conformity?
A signed statement from the supplier that the delivered goods meet the specified requirements: the drawing revision, materials, processes, standards and purchase order. It declares conformance; it is not a test report.
Is a certificate of conformity the same as a certificate of compliance?
In practice the terms are used interchangeably for the same supplier declaration that goods conform to requirements. Confirm your customer's exact wording, since a specific contract may define one precisely.
What is the difference between a CoC and a mill certificate?
A CoC is the supplier's declaration that the parts conform. A mill certificate is the material producer's record of the actual chemical and mechanical properties of the metal. One declares conformance, the other is material evidence; regulated parts often need both.
Do I need a CoC for every order?
No. It is worth requiring for regulated, safety-critical or traceability-driven work. For low-risk commercial parts it may be unnecessary. Decide by the program's requirements and state it on the purchase order.
How do I make sure the CoC is valid?
Check that it references the exact part number and drawing revision, the purchase order, the quantity and lot, the standards met, and carries an authorized signature and date. A certificate without that traceability is of little value.
Last reviewed: November 2026. Related reading: first article inspection and material certs, AS9100 vs ISO 9001 and what NADCAP is.
Need this part made?
Describe your part once and we'll match you to vetted Canadian shops that can actually make it, then bring back 3 to 5 quotes. Free for buyers, no account needed.